Skip to main content

Search the Special Collections and Archives Portal

upr000208 201

Image

File
Download upr000208-201.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000208-201
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles, July 14, 1936 BHP - SL LVL&W has r ig h t to 5.32 second feet o f water from springs and w ells Las Vegas for ir r ig a t in g ranch. This surplus water overflows from spring and runs down Las Vegas Greek through ranch where it is used fo r irrig a tio n purposes. This water meanders over considerable area spreads out and dissipates by soaking in s o il and evaporation to such extent water does not reach area on ranch under cu ltivation . Proposed to clean out and stra igh ten creek in order confine water in straighter and narrower channel, using dragline period approx. 20 to 25 days entire expense chargeable LVL&W Go. Do not have dragline available fo r this work acct two machines this D ist. being used elsewhere. W ill you pis quickly send dragline from one of other d is tric ts i f available? W ill not need operator as have experienced one av a ila b le . Pis advise. K-291 M - 2:30 PM if JUV- 15 1 #