Skip to main content

Search the Special Collections and Archives Portal

upr000280 118

Image

File
Download upr000280-118.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000280-118
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

I^OS ANGELAS & SALT LAKE RAILROj.D COMPANY UNION PACIFIC RAILROAD COMPANY - Lessee Description of improvements made to Water Production Facilities owned by Los Angeles & S^lt Lake Railroad Company at Las Vegas, Nevada, showing by work order numbers and years, facilities which were constructed subsequent to Janu­ary 1, 1931, and which are in place as of December 31, 1951. Exhibit No.___ Page No._„___1 Witness______ Year 1936 1937 1938 1939 1940 1940 1941 W.O. *No. Description ^Amount 684 ^Drilled new artesian Well No. 2, 802’ deep and constructed 2357* of new pipe line between Well No. 2 and Reservoir No. 1, replaced 364-6' of existing pipe line in transmission line from Reser­voir No. 1 and constructed fence around Well No. 2. 19 416 684 Description same as above. 552 Total for Year 19 416 552 1402 Replaced 6038' of pipe line and con­structed 1529' of new pipe line in transmission line from Reservoir No. 1. 8 215 1402 Description same as above. 295 1537 Drilled new artesian Well No. 3, 800' deep, Well No. 4, 806* deep, con­structed 1734' of new pipe lines from Middle Spring and Well No. 3 to Set­tling basin No. 1, Wooden derrick at - Well 4, concrete mats at Wells 3 & 4» Spring house at Middle Sprinrs, in­stalled pumping equipment at Middle Spring and constructed power line from Middle Spring to existing power con­nection. 30 459 8 215 30 754 1537 Description same as above. 109 Cr. .1815 Drilled new artesian Well No. 5, 489' deep and' Well No. 6, 500' deep; con­structed 625' of new pipe lines and re­placed 954' of existing pipe line be-toveen Settling Basin No. 1 ^nd Reser­voir No. 1. Installed pumps in Wells