Skip to main content

Search the Special Collections and Archives Portal

upr000175 322

Image

File
Download upr000175-322.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000175-322
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Hr. Vm. Reinhardt: Las Vegas - Harsh 28, 1949 W 2 > 1 { so - Hr* 1. S. Bluett) Xour letter February 24, file 1-7334, regarding proposed water stain extension to serve Block 5, Ladd1® Addition: X now enclose copy of application frost Desert Plaza Apartments, Inc., requesting that we extend a 6-inch line fro® our nearest main at 12th and Carson through the alley of Block 5 to sere# these apartments. I also enclose tracing showing this location and estimated cost. Stocker conferred with his Central Con­tractor, Ira Coldring, and they agreet that it would he better to have the Water Company make this extension. The contractor is to refund to Stocker the estimated cost of a 4-inch line and the balance is to be furnished by the First Bational Bank of Nevada at Las Vegas, Rather than draw a contract with Desert Plaza Apartments, Xnc., and later assign the refunds therefrom to the First National Bank^ it would probably be better to make the contract direct with the Bank and this is agreeable to Stocker. If you concur, will you kindly request Work order authority. A. M. Folger