Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
m LAS VEGAS LAND AND WATER COMPART Los Angeles - November 30, 1949 1-7334 Mr. L. A. White (CC Mr. W. C. Perkins, Mr. A. tt, Felger, Mr. Chas. Adams, } Referring to your Kailgram S-674, dated November 22, in connection with drilling of Well at Las Vegas authorised under WQ-598. We have reviewed the charges and oredits as detailed on Forms 4907, and they appeared to be correct with the following exceptions: November 1948 Vo 8098 Crane Co. 1 12x12x12® #529 C.I.Flgd.Tee F.A D. f 60.13 1 12" #555 C.I.Std. Blind Flange 11.69 1 12" #461 Gate Val. P.4 D. Flg&.W-l Comp. Figs. Bolts & Gasketa Bolted on 2 12x19 #553 C.I. Figs. F.& D. 2 12" Std. Granite Ring Gaskets 24 3/8 x 3-3/4" Maoh. Bolts W/Hsx Nuts should be credited 1286.30 and corresponding charges mads to MOH. Closeout report for LVL&WCo. Work Orders 598 and 598-1 - Drill one 12" water well and install 20 H.P. submersible pump on Las Vegas Ranch Property, Las Vegas, Nevada, Constructed by contraot one water well 1128 ft. deep using 1128 ft. of 16-inch No. 6 gauge double water well casing, and 65 ft. 5 in. of 20- inch No. 8 gauge conductor pipe cemented In place. Work commenced November 24, 1948. Work completed April 19, 1949. 1 at Less 2% 207.27 5.58 1273.51 12.79 $286.30 TE 1 Freight charges from Los Angeles,Calif. As the above materials were not used the Work Order is as follows: W. R X S I 2 i ' ! 3