Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
n . ' u s # n i necessary materials and labor to construct 335 feet of 6" cast 2 iron water main in location described as follows:. 3 Commencing at a connection with existing 6" water main at the southeast corner, of 4 Lot 4 Block 2, Desert Park Addition, thence southerly 33.5 feet to an end at 5 Bracken Avenue. 6 The cost of constructing said water mains is the 7 agreed sum of NINE HUNDRED DOLLARS ($900.00). 00 2. Said water mains shall be constructed of 9 335 feet of 6” cast iron pipe, equal to A.W.A. specifications and 10 all joints shall be of cement. Said pipe shall have at least 36” 11 covering, and the installation shall be subject to the approval 12 and acceptance of a duly authorized representative of the company. 13 3» At the sole cost and expense of the 14 Party of the Second Part, to construct connections for, and to 15 install fire hydrant in Bracken Avenue in location as required by 16 the City of Las Yegas, Nevada. 17 4. At the sole cost and expense of the 18 Party of the Second Part, to survey and accurately stake upon the 19 ground the line along which said water mains are to be laid, and 20 to indicate street and alley grades by appropriate stakes. 21 5. To furnish the Company easements, satis- 22 factory in form, where pipe lines are to be laid in other than 23 dedicated streets and alleys, said easements to be five feet on 24 each side of the center line of said pipe line. 25 6. To furnish a bill of sale for said water 26 mains, conveying to the Company all right, title and interest in the said water mains free and clear of all liens and encumbrances. - 2 - ll A-94