Skip to main content

Search the Special Collections and Archives Portal

man000205 43

Image

File
Download man000205-043.tif (image/tiff; 26.88 MB)

Information

Digital ID

man000205-043
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 square on Exhibit; ma “ near point 8. Section IT* In the event the District shall not have commenced to construct the new pipe lines and have removed the said existing pipe lines and pumping station as provided in Seetion 16 hereof within two years from the sale date and shall not have com­pleted said work within two ft) years and ten (10) months subse­quent to the sale date, Railroad Companies, after having given the Metric t sixty (60) Says* notice in writing of its intention a© to do, shall have the right (a) to eonstrust an adequate pipe line of a capacity equal to or exceeding that of the existing 2%-iach cast iron pipe line and 16-inoh transits and cast iron pipe line shown on said Exhibit kA” by broken black and red lines and of a type and site to be mutually agreed uponj and in the event the parties cannot agree upon the character of said proposed pipe line within ninety (90) days after said written notice, the same shall be constructed by 'Railroad Companies of 39-inch concrete or pipe of a similar character. Said proposed pipe line shall be constructed in the location shown in broken red and white line between points marked A and T and *? and I on said Exhibit "A"* (b) f© construct a ^4-inch pipe in the location shown In broken .red and whit® line between points marked K and 1 m Exhibit ,SA,! and an 8-Inch pip® line in location shorn in broken red and white lines between points marked t and D on Exhibit HA "$ it being understood that unless the S I ®