Information
Digital ID
upr000189-284
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.WM ay2 >211-,1 011953 Madsen Construction Corporation 9048 East Valley Boulevard Hoaemead, California Gentlemen* W© are in receipt of your letter of May 11, 1953, requesting break-down of construction costs for installation of water mains to serve Blocks 2 , 6 and 7, Tract 1, Block 6 of Tract 2, Boulder Data Homesites Addition, Las Vegas, Nevada* To serve the above described property, 339^ LF of 6 “ and 158 LF of 8" oast iron water pip® was installed along with 72 LF of 6 H cast iron fire hydrant connections to serve seven fire hydrants. The cost of installing 3466 LF of 6 M oast iron water lines was $13*992.38. The cost of installing 158 LF of 8" cast iron water lines was 1794.98. Ten percent (1Q$) overhead and supervision amounts to $1,478.74— making a total of $1o ,266.10. Trusting the above data will serve your purpose, I remain Yours very truly, L. B. Ma&g LBM-MED:d