Skip to main content

Search the Special Collections and Archives Portal

upr000189 284

Image

File
Download upr000189-284.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000189-284
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    WM ay2 >211-,1 011953 Madsen Construction Corporation 9048 East Valley Boulevard Hoaemead, California Gentlemen* W© are in receipt of your letter of May 11, 1953, re­questing break-down of construction costs for instal­lation of water mains to serve Blocks 2 , 6 and 7, Tract 1, Block 6 of Tract 2, Boulder Data Homesites Addition, Las Vegas, Nevada* To serve the above described property, 339^ LF of 6 “ and 158 LF of 8" oast iron water pip® was installed along with 72 LF of 6 H cast iron fire hydrant connec­tions to serve seven fire hydrants. The cost of installing 3466 LF of 6 M oast iron water lines was $13*992.38. The cost of installing 158 LF of 8" cast iron water lines was 1794.98. Ten percent (1Q$) over­head and supervision amounts to $1,478.74— making a total of $1o ,266.10. Trusting the above data will serve your purpose, I remain Yours very truly, L. B. Ma&g LBM-MED:d