Information
Digital ID
upr000162-067
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.4 LAS VEGAS LAMP AND WATER COMPANY TABLE C Pixed Capital SUMMARY TOTAL , Estimated—' 12/31/48 12/31/49 12/31/50 Original Cost Present-Day Cost $ 652,352 872,000 $ 803,011 $ 945,000 1,073,204 1,213,200 12/31/49 Original Cost 12/31/49 Present-Day Cost Sparling meter 8 " $ 842 $ 1,343 Water pump 255 430 W. I. pipe 3” 444 1,165 Welded steel pipe 6 " 14,423 19,889 C. I. pipe 2 " 575 575 | | 87,364 131,981 6 ** 351,009 456,278 8 ” 200,497 281,106 1 0 " 49,798 58,000 1 2 " 88,694 110,057 16" 904 1,524 Office furniture 332 863 Chevrolet sedan 1,039 1,683 Oldsmobile " 2,725 2,675 Shop building, frame 285 1,078 Equipment & tools 307 958 Chevrolet truck 1,779 1,860 International truck 1,739 1,739 Total $803,011 $1,073,204 1/ Estimated costs as of December 31, 1950, are equal to 12/31/49 amounts plus estimated net A ’S & B's for 1950 in the amount of $140,000.