Skip to main content

Search the Special Collections and Archives Portal

upr000140 282

Image

File
Download upr000140-282.tif (image/tiff; 24.08 MB)

Information

Digital ID

upr000140-282
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    X included therein and collected therewith, or any assessment liens for public improve­ments ; 2 - Conditions, restrictions, reservations, easements and encumbrances of record; excepting and reserving unto LVL&WCo. all minerals and all mineral rights, including oil and gas and rights thereto, without right of entry; consideration !§>1 0 , 0 0 and other good and valuable considera­tions; be, and the same is hereby, ratified, approved and confirm­ed. On motion duly seconded, it was RESOLVED, that the action of Vice President Strong in executing letter-agreement "NnLD 1998, dated December 8 , 1947, with Nevada Construction Company, covering the construction and laying of approximately 2280 ft. of cast iron water mains at Las Vegas, Nevada, as follows: Job No. 1 - Approximately 1580 ft. to serve first unit of Wollenzien and Wendel-boe Tract; Job No. 2 - Approximately 700 ft. to serve Block 2, Tract 5, Boulder Dam Homesite Addition; consideration $5,070, plus actual cost of premium on Surety Bond; be, and the same is hereby, ratified, approved and confirmed, Following Authority for Expenditure Requests, approved by the President, were submitted for ratification: AFE No. 6-1 (1947 Series), W.O, #574-1, issued Oct, 23, 1947; Las Vegas, Nevada,. covering construction of cast iron water line to serve Frontier Improvement Co., Blocks 2 and 3, South Fifth Street Tract No, 1, Said WO 574-1 supersedes and modifies WO 574, approved April 8 , 1947, Total estimated expenditure, $13,550, chargeable to Water System-Las Vegas, Nev,, Less ^>7,530 previously authorized by AFE No. 6 , 6 —