Information
Digital ID
upr000036-209
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.• 1 8 “ I tem B Unit (2) No. of Units (3) Year Average Con- Age structed (Yrs) (5) Bonanza Village Pump Bouse-Contd. 12*Gheek valve, Fl.(outside) * Ea 12* Gate Valve, PI. * * fotal Bonanza Village Pump House. Pump House at Reservoir #2 (Gh&rleston Blvd.) "35*"-- Jgr~-m^e;Wo&Tmni8 5f above ground* poured eono. 5f below ground. Gone.floor A pump foundations* wood frame roof with comp, roofing. Walls and floor below ground level water- 1 2 (Continuous pumping required during foundation construction) Equipment in Pump House: Pumps B<? 16* L fype *S* centrifugal JOOO GPM, 4o* head, complete with ©g 100 HP motor 3 phase, 60 Cy. l&O V. BJ Dwg. 2-B **£96 ga. Sump pump l£* Pac. Pump Go. Hod. O-Sb complete with j? HP motor and controls la 19^9 * proofed on outside, Dwg. 16179-17-lS. SP 950 19^7 Below Ground Level} Relnf. concrete or 60 • Reinf. steel Lbs 5,160 • Excav* wet clay 'ey 225 s * SR • 22 § N Backfill under floor - gravel « 135 £ * * * local * 136 • 19^7 19*7 ESTIMATED COST COST OF REPRODUCTION Est, | Unit New New Li f e Cond = Price Wi thout % Including Less (Yrs) % $ Overhead OH Overhead Depreci ation (6) (7) (8) (9) (10) (11) (12)