Skip to main content

Search the Special Collections and Archives Portal

upr000204 68

Image

File
Download upr000204-068.tif (image/tiff; 23.68 MB)

Information

Digital ID

upr000204-068
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

KEHO: Hr. Reinhardt: November 19, 195>3 1-733U Referring to your letter to Hr. Hanson Hoveraber 12 , 1953# relative to proposed construction of new water tank at Las Vegas incident to transferring water appropriation from water field to shop well* In conversation with Division Engineer*s office today I was informed that the awarding of oontraot for erection of this tank is being handled by Hr* W, 0. Perkins with a firm in Kansas City* Some time ago Hr. Perkins had Division Engineer make some soil tests at site where tank Is to be erected* Data was furnished to Mr# Perkins so foundation for tank could be designed* Division Engineer has not yet been furnished data and prints so foundation can be constructed by Division forces nor does Division have any information as to award of oontraot for tank erection which would indicate when construction is to be started or completed# * In the.meantime, water servloe forces are laying pipe lines and doing what they can tinder the work order, and I state this part of the work will be completed by the time the tank is erected* L* C. Conner