Information
Digital ID
upr000093-219
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.\ LOS ANGELES & SALT LAKE RAILROAD COMPANY Statement No0 'A Amounts charged to the Investment Account during the period January 1* 1952 to September 1, 1952 for additions and betterments 4728 Install pump and motor on wells Noe Q, 10 and 11$ extend power circuit and rearrange existing piping connections $ 4789 Construct booster pumping station including two pumps and 2400 ft0 141* transits water pipe line to. , connect with LVL&ff Co0*s propesbd pipe line in Bonanza Road, to to or extensions of water production facilities at Las Vegas& Nevada, which additions and betterments were completed prior to September l® 1952 Wo0 No® © Description of the Work Expended Jan e 1, 1952 to Sept9 1, 1952 Adjustments Applicable to the period prior to Jan0 1B 1952 Total serve West Side District Total $ 198 013 195©28 # 2 620*60 193©28 # 2 422©47 Auditor of Disbursements * Office Omaha, Nebraska, Hay 6, 1953