Skip to main content

Search the Special Collections and Archives Portal

upr000182 23

Image

File
Download upr000182-023.tif (image/tiff; 26.88 MB)

Information

Digital ID

upr000182-023
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Jan# 12, 1952 w 2>l-73 Federal Bom##, Inc,, 1700 S, Sixth Street, La# Vegas, Nevada bQ% VSeoguatsh, SeNecvoandda street AtTiiliTXuHi Hr* Jerome M&ok Dear Siri Referring to our conversation yesterday concerning installation of voter mains to s^rve proposed development of additional portion of Beverly Green Tract, Las Vegas, Nevada* To construct lines in Rexford Drive from Oakey Boulevard to St* Louis Street, in Ellen May and Barbara Way between Rexford Drive and Beverly Way with connection to existing fire hydrant in Beverly Way, we estimate will require installation of l^ho lineal feet of 6* oast iron water main* The estimated, cost of constructing such mains is |6olO, which amount pursuant to Nevada Public Service Commission Rule 9 will be subject tc refund, . ,, * 0 l t y awthoritlea advise it will be necessary to install 5 fire hydrants to provide adequate fire protection for the portion of the tract being subdivided. The estimated cost of water lines to serve these hydrants is #700, which amount will not be subject to refund. In addition tc the above it will be necessary that you secure from the city, at your own expense, the 5 hydrants, the cost of which likewise will not be subject to refund, of the above estimates includes a contingency item of 10$ which is to cover any unforeseen increase in material and other cost, Jur contract will provide, among other things, that you deposit the estimated cost of .56710,