Skip to main content

Search the Special Collections and Archives Portal

upr000274 18

Image

File
Download upr000274-018.tif (image/tiff; 23.68 MB)

Information

Digital ID

upr000274-018
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    % - 4 - Material handling costs: (Cont’d) LabMoorving to job Excavation Backfilling Unload and handle material Laying pipe Connecting pipe to Well No. 6 Constructing power line Construct well derriek Construct pump flange Installing pumps in wells Pour concrete foundation for derrick Cutting plates for wells Connecting pumps to new wells Install indicating and record­ing instruments Engineering-staking out pole and pipe lines Personal expenses Remove old 24” wood line Unloading 24” steel pipe Hauling 24” steel pipe Laying 24” steel pipe Covering 24” steel pipe Make connections to exist- in lines Cleaning up Engineering-stakes for pipe relay 15.71 628.29 69.4S 190.21 450.61 27.68 1 231.92 68306..2860 252.85 104.98 6.76 211.84 244.72 32.08 119.21 80.67 95.12 901.26 134.40 155.64 44 * 64 11.41 Contract work: Hall-Baker Exploration Co. Drill 2 wells SuHnadurlyi nigte mmse:n, tools and material Rental of digging machine Rental of owned equipment Public liability and property damage insurance Welding supplies Supplies for digging machine 3% for use of tools Hauling 24” steel pipe Replacement material: 1 1 Gate valve 24” 15 t SCH. IS.p igpoipte e2nd4” 3.79 Sto8r0e0 # eLxepaedn se 9.37&$ on 309.93.08 324.50 287.88 39.46 13.37 76.06 19.51 125.51 224.43 18.95 2.55 64.00 Investment 4 719.73 9 143.25 886.61 Operating Expenses 1 542.35 229.50 9.50 1468..2737 36.75 30299..9034 Total $32 702.97 $ 4 922.07