Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Schedule A Additions to Water System of Predecessor Company For the Period From Jarxuasy l, 1951 to September 1* 1952 Lag Vegas Valley Water District Schedule Reference Description Quantity ApApmoruanitsal Allocated Cost A—1 6 Inch CIP 35,489 LF $117,570.44 $ 81,279*60 A«1 6 Inch Steel Pips 650 LF 1,450*00 l,002o00 A=2 3 Inch CIP 13,871 LF 59,544*24 41, 3M« S3 A«3 10 Inch CZP 2,665 LF 14,642*56 10,122*80 A<=»3 12 Inch CIP 1,337 LF 8,573*60 5,927*18 A«>3 14 Inch CZP 2,545 LF 27,308*98 18,879*44 A-4 300,000 gal© elevated tank X 79,863*00 55,212*00 A-4 Booster pumping equipment for 300,000 gal0 tank X 25,107o00 17,357*00 A=4 Fencing => for 300 M gal0 tank 2,942*00 2,034*00 RMoeopbogrotmexy Services 877 (ea) 23,730*00 16,405*00 Total Schedule A $360,731*82 $249,383*55 Total Schedule A as above $360,731*82 Total per Schedule A-»5, differences Between Montgomery Report and Compiled figures ( 20,790o15) Total per Montgomery Report: Distribution Facilities $207,552*92 Transmission Facilities 132,388*75 $339,941*67