Skip to main content

Search the Special Collections and Archives Portal

upr000339 4

Image

File
Download upr000339-004.tif (image/tiff; 26.21 MB)

Information

Digital ID

upr000339-004
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    FORM 7 7 1 8 (Old Form 14-32) %% % L.®* 3597 PIPE LINE CROSSING i / F R P , ftL tZ S (SO. CAL.) Contract Audit '?in.A~ 9 3 ? 7 3 ® h i S A g r ^ m ^ n t , made and entered into this 1 4 t h day of Jfelfi® , 19&6 , by and between LOS ANGELES & SALT LAKE RAILROAD COMPANY, and its lessee, UNION PACIFIC RAILROAD COMPANY, corporations of the State of Utah, hereinafter collectively called “ Salt Lake Com­pany” , and 14 $ VEGAS VAl&iff Im m Qtmaet, a public cowpovtim &i tb* Uzt* * f ahwwda, hereinafter called “ Licensee” , WITNESSETH: Recitals The Salt Lake Company owns certain real property and operates.a line of railroad in the County of Clas& , State of«a0wi^^ipunder and across which and along and across the right of way of which, in the location indicated in yellow upon the map hereto attached, the Licensee has requested permission to lay and construct, and thereafter to maintain, repair, renew, use and operate * u .ri tlO) loaft pip& Mm 4a 100>£Ml » f 34-Inch di«, x 7/16 ixtch m m t & m im pipe for the purpose of conveying The Salt Lake Company is willing to grant the request of the Licensee, subject to the following terms, cove­nants and conditions. Agreement NOW, THEREFORE: I. In consideration of the covenants and agreements of the Licensee herein contained and the faithful keep­ing and performance thereof, and in further consideration of the payment HMMasSp in advance by the Licensee to Union Pacific Railroad Company of the sum of PIPS & 88/ IDO * » • * Dollars ($ 5 *09 ) to cover the cost of preparation and handling of this agreement, the cost of supervision, and as rental for the term hereof, the Salt Lake Company hereby grants to the Licensee the privilege and permission to lay, construct, use, operate, maintain, repair and renew said pipe line 1 1 I8 P 8SX across the property and right of way of the Salt Lake Company and under its said tracks in the location as shown in yellow upon the blue print map hereto attached, marked “ Exhibit A ” , A p r il 25* and made a part hereof n. In consideration of the granting by the Salt Lake Company of the foregoing privilege and permission, the Licensee hereby agrees as follows: 1. To lay and construct said pipe line in accordance with plans and specifications therefor submitted to and approved by the Salt Lake Company, under its direct supervision, and in a manner satisfactory to it. 2. To maintain said pipe line in good condition and repair at all times, to the satisfaction of the Salt Lake Company and under its supervision if, after the notice hereinafter provided for, the Salt Lake Company elects to supervise the doing of any maintenance, repair or renewal work. 3. To use said pipe line for the purpose hereinabove stated, and for no other purpose. 4. That the cost of laying and constructing said pipe line and thereafter operating, using, maintaining, repairing and renewing the same, shall be wholly borne by the Licensee. 5. That Licensee shall fully and faithfully comply with all lawful orders, rules and regulations of com­petent governmental authority. 6. That the Salt Lake Company shall have the right at any time after having given the Licensee thirty (30) days’ notice in writing, which notice may be, at the option of the Salt Lake Company, served upon the Licensee personally or by the United States mail, to require the Licensee to lower said pipe line or to change the location thereof; and the Licensee agrees, as soon as practicable after the expiration of sf id thirty day period, to make the changes directed by the Salt Lake Company, free of all cost apd expense to it and under its supervision if, after receipt of the notice in the next section provided for, it desires to supervise the same.