Skip to main content

Search the Special Collections and Archives Portal

upr000260 125

Image

File
Download upr000260-125.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000260-125
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    TMOMAS L. CAMPBELL i /\ o \ /r—• a « ^ P R E S ID E N T L A O V t L j A O H flkR Y E. MILLER S E C Y.-TR E AS. WILLIAM COULTHARD JAMES CASHMAN C. NORMAN CORNW ALL S. R. DUBRAVAC O f f ic e r s a n d Dir e c t o r s V A LL E Y W A TER D ISTR ICT P. O. BOX 1 109 LA S VEG AS, N EVAD A T elephones 6300 and 6301 WILLIAM C. RENSHAW C H IE F E N G IN EER AND G E N E R A L M ANAGER February 9, 1955 I Mr* W* H* Johnson Manager of Properties Union Pacific Railroad Company 422 West Sixth Street Los Angeles 14, California Dear Mr, Johnson Forwarded herewith are two copies of revised legal description and print* covering the easement required across the Union Pacific property, at Washington Street, The original request for this easement was contained in ay letter of January 12, 1955# The change was made necessary by the proposed con­struction of a building on the Norton Warehouse property, between Main Street and the railroad, which prevented laying the pipe line in the position originally contemplated* Since the contractor is already standing by with equipment for the railroad crossing, anything you can do to expedite permission to go ahead, pending execution of the Grant of Easement, will be very much appreciated# Tours very truly, WCRjejp Ends* W* G* Renshaw Engineer and Manager