Skip to main content

Search the Special Collections and Archives Portal

upr000282 96

Image

File
Download upr000282-096.tif (image/tiff; 27.45 MB)

Information

Digital ID

upr000282-096
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    I^V V at! on of said m t e ra&tn along the lines so staked upon the ground toy- the SuMivi&er, and to complete the said Installation with reasonable diligence, Said water mains shall consist of else.. I east Iron pip®, Construction of said water ss&la shall not bo eosaenoed until the provisions of this subdivision 1 have been ©implied with* 2* ft pay to the Subdivider at quarterly intervale, thirty-five percent { 3 5 $ ) of the monthly revenue received by it f r o m customers located within said Subdivision and taking direct service from the water stains installed hereunder, for a period of tan (10) years fro® the data of the completion of said Installation, or, until the Subdivides* has been repaid the actual cost of the line so advanced by it, (exclusive of the cost of construction of said fire hydrant connections) whichever first occurs. It 1® mutually agreedj 1* That the water mains so Installed shall be and remain the property of the company* 2* Should the actual cost of the installation of said water malms exceed the es tins ted cost of S ... . .. — * them and la that event the SnMIvlder will pay the excess to the Company, upon demand, if said actual east be less than I ... * then the Company will pay to the SuMivl&er the difference between salt estimated cost eo advanced and the actual cost, Hy actual cost if meant the ©oat of all material and supplies delivered to the Job* the cost of all labor employed In connection with the installation of said water sain, the cost of premium o n contractor1® surety bond, Public Liability, Property 3 -