Skip to main content

Search the Special Collections and Archives Portal

upr000270 3

Image

File
Download upr000270-003.tif (image/tiff; 23.68 MB)

Information

Digital ID

upr000270-003
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Hough Estimate of Cost to construct SO, 000,000-gallon Reservoir at Las Vegas, Nevada, Including Pumping Sta­tions, at two existing Reservoirs,together with neces­sary pipe lines, fittings, etc, and Two new wells* Item Amount I SO,000,000-gal, Reservoir, 335* x 671*, excavated below ground with concrete outside wall, concrete columns, girders and purlins with corrugated iron roof, as per James II* Montgomery plan, Sheets 2 and 5, # 968,000 Piping for Reservoir, including valves, fittings, valve boxes, and 12*, 56", 39* and 42* concrete cylinder pipe, 68,000 Engineering 4$, 41,000 Total, #1,077,000 Contingencies, 107,000 Grand Total § Reservoir, 1,184,000 II Pipe lines from 30,000,000-gal, Reservoir to existing Reservoirs Nos. 1 and 2, including 36* and 39* concrete cylinder pipe, valves and valve boxes, | 266,000 Contingencies, 27,000 Total - Pipe Lines # 293,000 m Additional pumps at existing Reservoirs Nos. 1 and 2 to provide adequate pumping head to deliver water to proposed 30,000,000-gal, Reservoir, # 25,000 Contingencies, 2,500 Total i Pumps, $ 25,300 Grand Total All Facilities in Plan, #1,730,000 IV Brill 2 additional 16* wells 800* deep, Includ­ing pumps to provide supplemental water to fill proposed 30,000,000-gal, Reservoir, # 56,000 Contingencies, 5,000 Total for Wells, i, 61,000 Grand Total All Facilities, #1,791,000 Los Angeles, Calif,, October 8, 1952 L* R, M«