Information
Digital ID
upr000001-011
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Estimated coat of laying 12 Inch concrete pipe from intake of iSain Pip# at Reservoir to Big Spring, and erecting Housing over Big Spring, Mb Vegas, iievada. Labor: Pipe Line Excavating for pipe line, 600 yards Laying pipe - 2850 ft* Building trestle, Drayag© - 99 Sons .25 • 12 i 1.00 .iuperintondonce, 10% House Over Spring Placing forms and excavating. Placing Concrete - 00 yards H 4*60 Putting on roof - 3000*BM to 8*00 Drayage - 80 Sons # 1.00 150*00 342*00 35.00 99.00 626.00 62.60 300.00 226.00 24.00 88.00 688.60 Ouperint©ndence, 10% 63.70 700.70 1389.30 Material: ‘ pipe Line Material for trestlo-por detail. 30.81 12” Reinforced concrete pipe-2580 ft # !$ • 60/1648.00 WffiTE Superintendence, 10% 157.88 1736.69 House over spring Form lumber - per 'detail, 63.49 Lumber - as per detail 56.23 Cement - 60 barrels to 2.35 117.50 Gravel - 45 yards it • 50 22.50 "258.^2 Superintendence, 10% 25.87 284.59 2021.28 freight - Los Angeles to Las Vegas, fotal, 1025.00 '4135.88 Nummary Labor - -Material- Freight- 1389.30 2021.£8 1026.00 | 4436.58 uorrec Los Angeles, February 1st, 1911. L.A.Form 30-697