Skip to main content

Search the Special Collections and Archives Portal

upr000177 608

Image

File
Download upr000177-608.tif (image/tiff; 26.92 MB)

Information

Digital ID

upr000177-608
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

L&a Vegas - January 11, I f 50 W 23-3-4 Hr, Mr, Reinhardts Following ay letter Sept 7th, regarding the well owned by 8 , B. Rodgers at 3200 Palomino Lane: Kenny dearies telephoned yesterday in connection with a well he has on his acreage located about a quarter alls below our holdings on Charleston Boulevard, He states the well was drilled about three years ago, to a depth of 515 feet, and produced 360 gallons per minute. However, last Fall he had the well deepened to feet and improved the flow to (he saye) approximately three million gallons per day. As this was considerably more than he oould use on his acreage, he inquired whether the Company would he Interested in acquir­ing his well, as he was selling off portion# of his aoreage and did not want to take on the responsibility of supplying water to the purchasers. I asked him for a copy of his well log and he referred me to the State Engineer* e representative here, Harry Jameson, from whoa X obtained the attached copy of well log, Searl es says the pressure at well was 39 lbs. after it was deepened and an Scinch liner installed to the 650 foot level, fhc well driller1* report indicate* a flow of 1200 to 1500 C.P.M., but this is merely an estimate. In discussing the subject with Hr, Jameson he offered to 00-oper­ate with us in taking an accurate weir measurement, but said a small ditcher would probably be necessary to clean out Searles* drainage ditch so Parshall flume could be installed. If you feel we should further pursue this offer 1 will arrange for measurements.