Skip to main content

Search the Special Collections and Archives Portal

upr000206 45

Image

File
Download upr000206-045.tif (image/tiff; 25.95 MB)

Information

Digital ID

upr000206-045
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Mr. Knickerbocker - #2 3/26/25 I f permitted to close out Work Order 4707 on this basis we w i l l then submit request fo r work covered by Budget Item 98 fo r concrete se ttlin g basin with 40* of 20* wood stave pipe and excelsior f i l t e r in water softener, as new additional property. The 24* wood stave pipe lin e 1816* long w i l l replace 1460* of 12" and 370* of 16" V.C. pipe encased in concrete. It is also desired to renew 1808* of 16" V.C* pipe encased in concrete with 16" wood stave pipe, handling both renewals on a betterment b a sis. The 16" wood stave pipe authorized by Work Order 4707 has been pur­chased but delivery deferred due to d e s ir a b ilit y of providing larger pipe fo r the f i r s t section of the lin e . The 1808* o f V.C. pipe encased in concrete constantly causes trouble and should be replaced with 16" W.S. pipe before the pressure is increased by in stallatio n o f 24" pipe at upper end of lin e . The to ta l estimated cost on basis of submitting new request is $22,170, of which $10,175 is chargeable to Capital Account and $11,995 to Operating Expenses, while Budget Item provides for $11,340 chargeable to Capital Account. I am attaching print of Dwg. S-235 showing proposed settlin g basin, also print showing the entire pipe lin e and work proposed together with detailed estimate. Assistant Chief Eraaiineer