Skip to main content

Search the Special Collections and Archives Portal

upr000119 213

Image

File
Download upr000119-213.tif (image/tiff; 27.15 MB)

Information

Digital ID

upr000119-213
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    / LAS VE0-A8 LAND AMD WATER COMPANY RESOLUTION G-eo. Miller Conet. Co* CLD - 15881 (File P-1587 FKC) RESOLVED, that the action of President E. H. Bailey and A s e t , Secretary S, J. How in executing Construction Agree­ment C.L.D, No, 15881 covering construction of sewer line extension to serve F.M.C, Corporation in City of Industry, California, dated February 16, 1968 and effective September 12, 1967, between Las Vegas Land and Water Company and O-sorge Miller Construction Company, a California corporation; work to be performed within sixty (60) calendar days after effective date, contractor furnishing all supervision, labor, tools, machinery and materials and all other items as required to construct sewer line, manholes and all appurtenances thereto as necessary to serve the Land Company1s oropprty; total estimated cost of work constructing this approximately 911 lineal feet of 12-inch extra strong sewer line, with its necessary appurtenances, is #9*759,00; it being understood that said amount is an estimate only and that final amount due shall be based on actual cost Incurred in performing said work; be, and the same is hereby ratified, approved and confirmed, Adopt e&------- -