Skip to main content

Search the Special Collections and Archives Portal

upr000037 61

Image

File
Download upr000037-061.tif (image/tiff; 23.37 MB)

Information

Digital ID

upr000037-061
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V the facilities of the Basic Magnesium Plant are to operate efficiently, it is essential that they have a definite and 7 satisfactory arrangement for their water supply. The 1970 demand for water other than artesian can be summarized as follows: Metropolitan Las Vegas Present domestic demand deficiencies Domestic requirements for population Increase Additional requirements at Army Air Field Requirements at Basic Magnesium Plant Requirements of Whitney and Pittman Total demand In addition to artesian supply 5.0 m.g.d. 6.0 m.g.d. 3,7 m.g.d, 6,5 m.g.d. 1.0 m.g.d. - 22.2 m.g.d. It is apparent from the above table that the provision of water from other than artesian sources is absolutely essential to the Las Vegas Valley. WATER AVAILABLE FROM THE SYSTEM AT THE BASIC MAGNESIUM PLANT The water supply facilities at the Basic Magnesium Plant will produce approximately 35,0 m.g.d. The water treat­ment facilities have a designed capacity of 20.0 m.g.d. but will operate efficiently to a rate of 24.0 m.g.d. dlhese facilities are adequate to supply treated water for the 1970 anticipated domestic, industrial, and commercial demands. As a result of the complete treatment provided the water will be free from hardness and will be of an excellent quality without the objectionable taste of chlorine or other treatment chemicals 3'