Information
Digital ID
man000213-001
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.was Vegas Valley Water District tmtmmmmummatmmammmmmefBaa&ammtmamammmammmmmmmmammtmmimMmmm Additions to Water System of Predecessor Company For the Period From January 1, 1951 to September X, 1952 Schedule Reference Description Quantity ApAmporuanitsal Allocated Cost M L 6 Inch CIP 35,489 LF $117,570*44 $ 81,279*60 A~1 6 Inch Steel Pip© 850 IF 1,450*00 1 ,002*00 A=2 8 Inch CIP 13,871 LF 59,5*4*24 41,164* 53 A-3 10 Inch CIP 2,665 LF 14,642*56 10,122*80 A-3 12 Inch CIP 1,337 LF 8,573*60 5,927*18 A«»3 14 Inch CIP 2,545 LF 27,308*98 18,879*44 A-4 300,000 gal© elevated tank X 79,863*00 55,212*00 Booster pumping equipment for 300,000 galo tank X 25,107*00 17,357*00 A>4 Fencing <=> for 300 M gal0 tank 2,942*00 2,Q34*C0 Montgomery Report Services 877 (ea) 23,730*00 16,405*00 Total Schedule A $360,731*82 $249,383*55 Total Schedule A as above $360,731o82 Total per Schedule A®5, differences Between Montgomery Report and Cccpiled figures ( 20,790*15) Total per Montgomery Report: Distribution Facilities $207,552*92 Transmission Facilities 332,388o75 $339,941*6?