Skip to main content

Search the Special Collections and Archives Portal

upr000145 130

Image

File
Download upr000145-130.tif (image/tiff; 24.09 MB)

Information

Digital ID

upr000145-130
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

12, 1940. On motion duly seconded, it was RESOLVED, that the action of Vice President Strong in executing letter-agreement, dated August 14, 1940, ad­dressed to Pood Machinery Corporation, P. 0. Box 584, River­side, California, covering the furnishing of necessary labor, materials, transportation, etc., required to rehabilitate, alter and rearrange machinery and equipment in packing house at Fourth and Vine Streets, Riverside, California; considera­tion $>3,614.72, covering all labor performed, materials furnished and as rental of equipment; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Strong in executing letter-agreement, Audit No, 10090, dated August 22, 1940, addressed to Acme Sheet Metal Works, 6133 Magnolia Avenue, Riverside, California, covering the furnishing of new equipment for and the reconditioning of sweat room heat­ing units in packing house at 4th and Vine Streets, Riverside, California, as follows: Replace with new furnaces five 75-U9 Pacific Gas Radiator Company Furnaces; Vent five sweat room furnaces and one office furnace to outside of building; Recondition five automatic controls; Replace five safety pilots with five new type safety pilots; and Replace five Mercoid switches; consideration $>721.00 to cover all labor performed, materials furnished and as rental of equipment; be, and the same is hereby, ratified, approved and confirmed. -2-