Skip to main content

Search the Special Collections and Archives Portal

upr000221 97

Image

File
Download upr000221-097.tif (image/tiff; 24.34 MB)

Information

Digital ID

upr000221-097
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    OUTLINE OF WORK TO BE PERFORMED ON EACH WELL BY BARBER-BRIDGE DRILLING CORPORATION, LTD. wett.t.r NO. 9, 10 and 11. START WITH WELL N0,_1Q * WIRE BRUSHING AND CLEANING ABOVE WELLS 1. Measure flo w o f w e ll. (Use R. R. Co. w eir) 2. Determine i f w e ll is sanded up p art way. I f so, t a le out sand. 3 . Clean w e ll by s t e e l brush. 1. Measure flo w to determine bow much, i f any, the flo w has increased. (Use R. R. Co. w eir) 5. Furnish and i n s t a l l t e s t turbine pump and measure flo w by means o f o r i f i c e at varyin g depths from say 1 $* to 20 or s lig h t ly low er in order to determine flo w , w ith view o f p o s s ib ly in s t a llin g a _c e n tr ifu g a l pump on top o f w e ll in event the flo w i s s a tis fa c to r y . 6 . Continue t e s t o f w e ll to low er depths p o s s ib ly to say 50* to 100* to determine production o f w e ll in event turbine pump is in s ta lle d , and determine draw down, i f any. 7. Check flo w o f these w e lls by R a ilroa d Company w eirs to compare w ith flo w as measured by o r i f i c e on t e s t pump. Time f o r pumping t e s t , approxim ately fou r to s ix hours, more or le s s . I t I s understood th at i f the d esired re s u lts are obtained by th is method o f cleaning these w e lls the R ailroad Company may consider cleanin g the oth er w e lls .