Information
Digital ID
upr000334-190
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.UK>7E'D STAT£". RA{i?OaD / 0 MIT? * ST R A T * 0 N W. C. Me/ • C ertM'&l 'Viryaefs. .Las Vegas pipe line. Los Angeles,Cal., August 22, 191- Mr. A. Maguire, Chief Engineer usan “* / / Returning attached form covering has Vegas pipe line. I do not think we had better send this through /nd‘get it approved now before the work is done, but think we should revise the form on new blanks to cover the over -ex pen di twh ic h has already \ . m been made and also to include the additional expenditure ox putting in the new pipe, £. Yours truly, J A/ S' / m i ' i & y - 9 C *• >f. J" \ '/ </ , N / 3 A - / <r A 1 / / J ^ ^ S / 1 / * 1 / list > ^ * / ' ^ j ^ llllll *** V / w - ? it ^ -4" / ^ 'T3 5 <3f