Skip to main content

Search the Special Collections and Archives Portal

upr000179 132

Image

File
Download upr000179-132.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000179-132
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Las Vegas - November 1 6, fgjgj Kp . A* K. Folgan Referring to le tte r from m * Ahlavede regarding construction of 2* service lin o across South Bain S treet l a i t August. During the construction of 4 lane highway in South Main S tre e t, the S tate Highway Departments contractor to re out the J * line crossing Main S treet a t Boulder Avenue. This 3“ lin e fed a 2* lin e on the west aide of Main Street serving Ahlavede's building and several other ©©nstsaers. I t was my understanding In conversation with you th at we would run several 1* lin es aerose Mate S treet and oonneot i t to the 2* lino regaining in plane* th is was dono* During your abeenoe Mr. Ahlavede oane to the Vater Office and a fte r gone discussion with Mr# Bell and a© stated he would have to have a 2* lin e across Main S treet even i f he had to pay fo r i t himself# 1 told him we had no authority to run a 2* lin e across there and he said he would furnish the matoriaX and employ a plumber i f we would dig the d itch . This was done. The 2* lin e Is s t i l l in place on the west side of the s tre e t and we have e «• 1* connections leading to i t which. In ny opinion, should furnish adequate volume of water to Mr. Ah&swe&s without the need fo r a separate i® lin e . As long as he agreed to pay for the labor fo r the plumbers time and the m aterial furnished, and we out the ditch and backfilled i t , X do not think we owe anything on the plumbers bill# F. A. Doyle