Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.M O N T G O M E R Y & C O . I N C E N G I N E E R S SCKBDOLg 40 STEEL PIPE (Cost aa of Dec. 31, 1950) Collection & Transraission Facilities 12" 10" 8" 6" 2" Weight per foot 53.6 40.5 28.6 19.0 3.66 Cost per foot A,9309 3.3590 2.7537 2.4043 0.4328 Haul @ ,001/lb. .0536 .0405 .0286 .019 .0037 Load @ ,00l/lb. .0536 • 04.05 .0286 .019 .0037 Cost on Site 5.0381 3.4310 2.8109 2.4423 0.4402 Width of trench 1.5 1.33 1,16 1.0 .67 Depth of trench 3.16 2.92 2.66 2.50 1.25 C.Y. per foot .193 .144 . .114 .0925 .031 Cost, backfill .35 .259 .205 .166 .056 Laying & Joint , @ 2-1/2$/ inch. .30 .25 .20 .15 ,10 Installation Cost •65 .509 .405 .316 .156 TOTAL COST 5.69 3.94 3.22 2.76 0.60 51