Information
Digital ID
upr000182-109
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Mr* Reinhardt - Z In event the area, or any substantial parcel, along Highway 95, northwesterly of the Sweeney Tr- ot is subdivided, such subdivider would demand service from the nearest line and as the lines to be constructed under the alternate proposal would probably be inadequate to provide adequate service for such development, the Water Company would be obligated to construct the 10 '• main along Highway 95 from Honansa Hoad to intersection of Beverly Drive as Indicated by green line on Map No. 1. The estimated cost of constructing the 1 0 m&ln at present is I? 500* As the cost of constructing the alternate lines, estimated at |31 750» will be an outright donation, and as th® cost of constructing the 10*1 line, if and when required, is estimate to be less than the anticipated refunds that would be payable to the subdivides under the original proposal to the subdividers, I request authority to negotiate with Mr. Sweeney on the alternate proposal, I have discussed this matter with Mr. Bennett and he sees no legal objection* W, H, Johnson