Skip to main content

Search the Special Collections and Archives Portal

upr000177 28

Image

File
Download upr000177-028.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000177-028
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Mr. !*• A# White Las Vegas - June 23, 1950 W 23-1-61 ¥ 23- 1-62 Your letter of June 15* file 30 3-2-h, regarding close out reports on work orders 63! and 635 respectively* Following Is the method under which the amounts refundable 'were computed under each of these work orders: VO»63l f5#6l7.b| $6#*77*3© ,,... S?L.M s H B lUaDvA# (AFoHc*tS#) PTioataa l1 0# Total Cost LC03 M Refundable Xou will note from the above that the 10# Was added to the coat of last- lling fire hydrant lines and our basis for this was Article III, paragraph 2 of the oontract which provides! •By aotutl cost is me«.nt the cost of a l l imtsri&X and applies delivered to the Job, the cost of all labor employed In connection with the installation of said water m in, the cost of premium on contractor* s surety bond, Public liability, Property Damage and. Goatraotor*® (2<jntraotural Liability Insurance, plus 10 percent (10,6) for supervision and overhead# * A# K# Teller