Skip to main content

Search the Special Collections and Archives Portal

upr000093 42

Image

File
Download upr000093-042.tif (image/tiff; 26.55 MB)

Information

Digital ID

upr000093-042
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

1 2 5 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Section 5. After the sale date, the following work shall be performed: (a) The construction of a 39-inch reinforced concrete or concrete cylinder pipe line in location shown by broken red and white line between points marked A and V and V and K on said Exhibit "A” connecting with existing 24-inch cast iron pipe line and 16- inch transite pipe line at point marked A. (b) The construction of a 24-inch cast iron or concrete lined and coated steel pipe line in location shown in broken red and white lines between points marked K and E on Exhibit "A" con­necting at point K with the pipe line referred to in subparagraph (a) of this section and at point E with existing 24-ineh cast iron pipe line. (c) The construction of an 8-inch east iron pipe line in location shown by broken red and white lines between points marked Y and D on Exhibit "A" connecting at point Y with the pipe line referred to in subparagraph (a) of this Section 5 and at point D with existing 8-inch cast iron pipe line. (d) The relocation of the pumping station now located at point HH to a new location shown in solid green square on Exhibit "A" near point R. (e) Construction of a 14-inch cast iron or concrete lined and coated steel pipe line in location shown by red line between points marked S, T and U on Exhibit "A" and extending to a connec­tion with existing 12-inch cast iron pipe line near point marked S and to a connection with existing 12-inch cast iron pipe line in 24