Information
Digital ID
upr000208-009
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.% X»os Angeles, January 29, 1929. 9315-355 Mr. W. M. J effers: Referring to attacked telegram: When the 1829 budget item fo r additional 24 inch oast iron pipe m s being prepared, i t was known that there would be a considerable unexpended balance, approximately #10,000, on the 1928 item, which covered construction of 2,800,000 gallon capacity reservoir, and 500 f t . 34-inoh cast iron pipe. For that reason the 1200 f t . additional pipe was not included in the 1929 budget item. much as possible. Possibly good judgment was not used in so handling. The reason there was a heavy unexpended balance in 1928 was due to the favorable bid received on the reservoir construction. The idea was to hold down the la tte r as F. H. Knickerbocker