Skip to main content

Search the Special Collections and Archives Portal

upr000267 130

Image

File
Download upr000267-130.tif (image/tiff; 32.85 MB)

Information

Digital ID

upr000267-130
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    % BOOSTER STATIONS Ho. 1 - West of Intake on Lake Read * - 5 0 0 H«P. Units 10 H O B 250' TDH ea. 9 $11,4-33.00 (pump a n d bo tor) $4-5,700 Valves, check, controls, etc., pump fans. 46,000 B o o s t e r P u m p Ho. 40* at 70* $ 25* 0 0 0 1 1 0 ,766 Mo. 2 - Booster on 40* Line 4-500 H.P. Units 10 MOB 250' TDH ea* 9 $11,433*00 (pump and motor) $45,700 Valves* cheek, controls, pump fdns. 46,000 Booster Pump So. 401 x 701 20,000 H 557755 So. 3 - At J u n c t i o n W e s t o f P i t t m a n 4-500 H.P. Units 10 MOB 24*' TDH ea. 9 $11,433.00 (pump and motor) $45,700 Valves, cheek, controls, pump fdns. 4©,000 Booster Pump Ho. 40* x 70' 25,500 Return pump from Junction to B.M.X. Reservoirs 1-1000 H.P. u n it * MOB 520* TDH 9 $20,532.00 (pump and motor) 20,500 Valves, check, control, fdns., inol. installation pumps 10,000 $141,705 Ho. 4 - Booster on 42* lino East of Las Vegas 5-500 H.P. Units 10 MOB 240* TDH sa. 9 $11,433.00 (pump and motor) $57*200 Valves, check, control, fdns. 5°,000 Booster Pump House 40* x 70' 20,500 $127,765 Contingencies Engineering - Plans - Inspection Total Booster Stations TO BE CONSTRUCTED IN T O T A L $110,700 $110,700 105,700 105,700 $5*,000 *5,700 141,700 127,700 127,700 5*,000 429,*00 4*5,*00 *,000 10,000 98 9$ 00 0ro O 0 72,200 30,000 PRESLEY AND HAKSKM ESTIMATE 1950 —ms— T O T A L - $210,000 $210,000 - 16*,000 16*,000 $75,000 217,000 292,000 230,000 230,000 75.000 11.000 40.000 *25,000 124,000 34,000 900,000 135,000 74,000 $74,000 $514,000 $5*3,000 $126,000 $9*3,000 $1,109,000