Skip to main content

Search the Special Collections and Archives Portal

upr000188 79

Image

File
Download upr000188-079.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000188-079
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    O F F IC E o f e x e c u t iv e a s s is ta n t m ar | 1942 LOS ANGELES, CALIF. La s Vegae - March 4, 1942 W 23-3-5 Hr. c. B. Sexton, Chairman, Public service Commission, ©arson 8 1 % , Hevada. Bear Hr. Sexton: Mr. Bennett sent Be copy of yoor letter February 28th. inquiring with regard to additional water production that will be available in Lae Vegas, as previously referred to in Commission1 c Case Bo. 1123. the testimony therein (Page 158) indicated the supply then available from two springs and six wells was 6,288,640 g.p.d. Since then, by the installation of P«®ge» we have increased the production of Well Ko* 6 to 1,172,880 g.p.d. and of *Tell Ko. 6 to 1,134,000 g.p.d., so that we now have available 7,812,860 g.p.d. We also have received authority and are now actually engaged in drilling additional wells, of which we anticipate there will be four this Summer,. Two of these will be drilled to what Is known as the shallow zone and we will Install pumps to augment their production. The other two will be deep wells. We also plan to install chlorinating facilities at the Middle or Open Spring so that the water fro® this source nay also be utilized and that will 1 norease the production about 200,000 g.p.d. We are also planning to install a booster gg|§ to increase the pressure in distributing sains, during season of heavy demand in summer months. bike everyone else we are experiencing some difficulty In securing materials, bat are confident with the supply now available and the additional wells we plan to drill* we ©an very nicely take care of the demand. Very sincerely yours, bey Mr. Mr. Mr. Mr. Fiaik Strong E . E . B e n n e tt Leo A. McNamee m m a r w O T g i r Vice President