Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
(g) The construction of a three-phase power line connecting with the facilities of the SOUTHERN NEVADA POWER COMPANY so as to provide power for the operation of the water production facilities upon the lands shown tinted in pink on Exhibit "A" in location shown by broken red and white line between points D and Y and Y and V on said Exhibit "A". (h) The removal of that certain pipe line shown in broken black and white line between points KK and LL on said Exhibit "A". (i) The removal of that certain pipe line shown in broken black and white line between points II and JJ on said Exhibit "A". (<j) The removal of those certain three-wire power lines shown in broken black and green line between points AA and BB and between points PF and HH on said Exhibit "A". (k) The removal of those certain six-wire power lines, two-wire telephone circuits and two telemeter wires shown in broken black and green lines between points CC and GG on said Exhibit "A". (l) The removal of that certain cast iron pipe line shown by broken red and black line between points marked A and E on Exhibit "A", that certain cast iron and transite pipe line shown by broken red and black line between points marked A and K on Exhibit "A", and that certain pipe line shown by broken red and.black line between points marked R and HH on Exhibit "A". The performance of said work, the completion thereof and payment therefor shall be at the times and in the manner provided in this Section 5- The top of all pipe lines to be constructed (except those within the boundaries of the pumping station site described in sub-paragraph (l) of Section l) shall be at least four feet (4') below the surface of the ground. Immediately after the work described in subparagraphs (a) to (g) of this Section 5 has been completed and the facilities therein described placed in operation, the pipe lines and wire lines described in subparagraphs (h) to (l) of this Section 5 shall be removed from the lands of the First Parties and the surface of said lands restored to substantially the same condition ex- REFERENCE: y O*M§ at_t_e__nt_io_n:2 ft m O n MR- ll. If) r* 16.