Information
Digital ID
upr000186-026
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Mr. Mm. Reinhardt April 22, 1953 agreed to the terms of an agreement which will be written between them and the Water Company. One of the parties included In the Trusteeshlp with the Title Company is a Mr. Mel Cooper, who has been engaged, during the last several months, in constructing a motel at the end of the proposed pipe line as indicated on attached print, and the principal reason for the urgency for the construction of this line is that this motel will be complete on May 1 and unless water line is complete by that time, they will be unable to open the motel as scheduled— which I am advised will result in considerable financial loss to them. L. ft. Maag LRM/dm Enc.