Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Estimated Cost of Drilling 2 Wells and construeting appurtenances, based on bid from Hall-Baker Co* Labor Material R*& B* 0* B, Erlll 2 wells, approx* 500* deep, Including fumlsblng and Installing casing. Contract - Hall-Baker Co. $ $12,500 $12,500 Construct pipe line connections from wells to collecting lines, 500 1,050 1,550 Install pumps and motors and construct pump bouses, Construct concrete mat around well and fence, Construct power line, including transformers, etc* Install telemeter and construct circuit, Replace 954* of 24® redwood stave pipe with welded steel * pipe, Current price adjustment-valve- of parts replaced, Contingencies, Totals, Total Estimated Expenditure 450 4,650 5,100 150 250 400 1,215 4,280 5,495 100 500 600 2,350 2,700 2,700 2,350 2,700 2,700 475 2,580 2,555 500 $5,240 $28,510 $28,200 $5,550 $33,750