Skip to main content

Search the Special Collections and Archives Portal

upr000264 192

Image

File
Download upr000264-192.tif (image/tiff; 26.55 MB)

Information

Digital ID

upr000264-192
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    would wish to have your opinion as to whether you would he cont­ent with the hole being finished or lined with 10'1 pipe in that portion of the hole that might be drilled below the bottom of the 12" pipe before entering into a contract with you, if our pro­posal is accepted* With reference to requirement # (8), in regard to the 48 X hour production test, no mention is made as to in just what manner you might wish to make this test and if a contract should be entered into the requirements should be clear as to how this test is to be made* .deferring to Requirement # (10), our workmen are protected through the .Nevada Industrial Commission and we carry 50/100 public liability and property damage insurance on all equip­ment • Trusting that our proposal bid will meet with your approval and tIUuaking you very kindly for the Invitation to bid, we remain, Yours very truly, S. R* MCKINNEY & SON SM/lm