Skip to main content

Search the Special Collections and Archives Portal

upr000221 113

Image

File
Download upr000221-113.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000221-113
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    UNION PACIFIC RAILROAD COMPANY Las Vegas, Nevada Location: E levation : 3/17/42 - 3/20/42 I 3/21/42 . - 3/22/42 - 3/23/42 - 3/25/42 | Water W ell #8 H istory 290* South and 728* West o f E-J Corner, Section 31, 20-61, M. D. B. f§ M. 2126* (Cement Matt) Spudded at 1:00 P.M. D r ille d 20-3/4" hole from 0 to 24.55 D r ille d 18-1/4" hole to 510. Attempted to run 13-3/8" - 48# South Chester Tube Co.*s lapweld, screw casing. Started running easing at 11:15 P .M ., March 20th. Casing started hanging up occasion ally from 90* down; when shoe had reached 416* at 5:05 A .M ., March 26th, the casing became loggy when p u llin g upward to fre e s li p s . A l l o f 13-3/8" casing was then p u lle d out. Hole was reamed with 18-1/4" Crum b it and 3 addition al feet o f hole made to 513. Ran 538.26* o f .13-3/8" - 48# South Chester Tube C o .'s lapw eld, short thread, 8-V thread casing and cemented shoe o f same at 510.57, using 388 sacks o f V ic to r M odified Cement, none treated . Baker cement flo a t shoe on bottom o f casing. The cement was mixed and pumped down by the r i g 's crew and pumps, using two Perkins plu gs. The shoe o f the 13-3/8" casing was f i r s t run to 511, then p u lled up to 510.57 and held there while pumping out the cement. Started running casing at 1:00 A .M ., March 22nd. Finished cementing at 8:42 A .M ., March 22nd. Casing stood cemented 36 hours. Ran in w ith 12-3/8" Crum b i t . Found top o f hard cement at 420. D r ille d out cement and 13-3/8" shoe and d r ille d ahead w ith 12-3/8" b i t . With bottom o f hole at 766, attempted to run in 10-3/4" lin e r 283.81' |oiig. Started running lin e r at 10:10 P.M. March 25th. Could not work shoe o f l i n e r below 572. Started p u llin g 10-3/4" lin e r out o f hole at 12:40 P .M ., March 26th.