Skip to main content

Search the Special Collections and Archives Portal

upr000172 167

Image

File
Download upr000172-167.tif (image/tiff; 26.88 MB)

Information

Digital ID

upr000172-167
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Las Vegas - October 26, 1<M*8 W 2 3 - 1 Mr. Wo. Reinhardt: Please see your file 1-7336 of May l?th oon-oerning improvements contemplated by the Board of Educa­tion to aeco flod&te additional pupils at the High School here* She Board now contemplates construction of a school building approximately 60 x 335* at an estimated cost of $300,000 to be located across 8th Street, which has been closed, and face on Bridger. We have an 8-inch oast iron water sain in 8th Street, the northerly 120* of which they request that we remove so that the building will not be constructed over & water line, and relocate same around the site of the future building* She Board of Education will, of course, provide us with necessary easements and will assume the cost of relocating the pipe line, and replacing of pavement in Bridger. For ready reference, I enclose Plot Plan showing buildings and, in dotted red, the existing 8-lneh oast iron pipe line and, in solid.red, the proposed location* At­tached also is estimate of cost* A. M. Folger