Skip to main content

Search the Special Collections and Archives Portal

upr000338 45

Image

File
Download upr000338-045.tif (image/tiff; 26.12 MB)

Information

Digital ID

upr000338-045
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Labor M atl T o ta l Mr. 5 . L* Adamson, 3ieet Woi 1 1 * Fittings fo r compressor le t $53.77 Foundation Concrete - reinforced C.T.12 $196.47 70.36 i4.802.47 (44) Total ledger value power plant equipment: $79,106.03 Work Order 7233 was approved May 10, 1927, to cover the in sta lla tion o f gaierator and condenser and the replacement o f feed water heater. Wo work had been performed up to May 31, 1927. (7) Water Line Supplying Power Plant Work Orders 1178 and 1226. completed in 1912 8* water lin e from main pipe lin e to Power House 750* o f 8* pipe and fittin g s ) . , $“ 8-71 **>9.25 $ 817.96 ( 29) 10 * *18" n * m j Total ledger value water lin e supplying power planti $ 817.96 (8) Fuel O il F a cilitie s Fuel Oil is used in producing power and power is sometimes used in the production and distribution o f water, th erefore, ledger value o f the fuel o i l f a c ilit ie s fo r storing and delivering fu el o il to the power house are included in this study. Original Construction. Caliente to Brie. 1903-1906 in sta lla tion fuel o i l storage tank, delivery tank, pump and piping. Fuel O il Storage Tank 30,000 b b l. steel tank 1 4 '8M high x 120* diameter, in stalled complete in p la ce , ea. 1 $1,269.11 $10,180.64 $11,449.75 (19) Delivery Tank 470 b b l. steel tank on elevated platform consisting o f 10,824 F.B.M. ea* 1 613.68 1,142.40 1,756.08 (19) Worthington duplex o i l pump 6^x7^**x6H ea. 1 44.52 171.94 216.46 (19) records o f the The above Worthington pump was replaced, according to theJ£.P.&.M. Department, without Work Order authority, with Worthington duplex pump 7^*uc7*S.O*, #418772, but as no ad­justment has been made in Capital Account, ledger value o f the origin al pump is in­cluded in this study. Pipe Lines 702* o f 2** pipe with fittin g s complete in place (assumed to be steam lin e to heat o il in supply lin e and delivery tank)