Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Labor M atl T o ta l Mr. 5 . L* Adamson, 3ieet Woi 1 1 * Fittings fo r compressor le t $53.77 Foundation Concrete - reinforced C.T.12 $196.47 70.36 i4.802.47 (44) Total ledger value power plant equipment: $79,106.03 Work Order 7233 was approved May 10, 1927, to cover the in sta lla tion o f gaierator and condenser and the replacement o f feed water heater. Wo work had been performed up to May 31, 1927. (7) Water Line Supplying Power Plant Work Orders 1178 and 1226. completed in 1912 8* water lin e from main pipe lin e to Power House 750* o f 8* pipe and fittin g s ) . , $“ 8-71 **>9.25 $ 817.96 ( 29) 10 * *18" n * m j Total ledger value water lin e supplying power planti $ 817.96 (8) Fuel O il F a cilitie s Fuel Oil is used in producing power and power is sometimes used in the production and distribution o f water, th erefore, ledger value o f the fuel o i l f a c ilit ie s fo r storing and delivering fu el o il to the power house are included in this study. Original Construction. Caliente to Brie. 1903-1906 in sta lla tion fuel o i l storage tank, delivery tank, pump and piping. Fuel O il Storage Tank 30,000 b b l. steel tank 1 4 '8M high x 120* diameter, in stalled complete in p la ce , ea. 1 $1,269.11 $10,180.64 $11,449.75 (19) Delivery Tank 470 b b l. steel tank on elevated platform consisting o f 10,824 F.B.M. ea* 1 613.68 1,142.40 1,756.08 (19) Worthington duplex o i l pump 6^x7^**x6H ea. 1 44.52 171.94 216.46 (19) records o f the The above Worthington pump was replaced, according to theJ£.P.&.M. Department, without Work Order authority, with Worthington duplex pump 7^*uc7*S.O*, #418772, but as no adjustment has been made in Capital Account, ledger value o f the origin al pump is included in this study. Pipe Lines 702* o f 2** pipe with fittin g s complete in place (assumed to be steam lin e to heat o il in supply lin e and delivery tank)