Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
A fte r cementing p u lled up above 7" blank and washed out excess cement* fte ll stood cemented 17 hours. Cleaned out cement to 1150. Cement took weight o f d r i l l pipe from 1090 to 1 1 0 0 '. At 9* 30 A .M ., _June 1 st, ran in sm b assembly on bottom o f 4$ " d r i l l pipe and held bottom o f swabs at 1042 to make te st o f effe c tiv e n e ss o f cement job on 7” C.P. at 1094. Applied pump pressure down through d r i l l pipe. Found that mud f lu i d circu lated around the 7® blank casing a t 125#. pressure. Cement job not holding. On the same day ran a H allib u rto n formation te ste r to make a fu rth er te st o f the 7* C.P. a t 1094 and to obtain water seaples o f the zone 110 0 to 1 1 5 0 . fe s t e r was run on bottom o f J§§ d r i l l p ip e. Packer on te ste r was set at 1 0 4 2 . Put 200* o f water in d r i l l pipe above te ste r to act as a cushion. Ho bean in te s t e r. Opened Valve in te ste r at 2: 37 P.M. Closed valve in te ste r at 2:55 P.M. During the 18 minutes valve was open the f lu i d outside the d r i l l pipe dropped 100* fe e t. F lu id in sid e te ste r (in c lu d in g 200’ water cushion) was 210* below the ro tary ta b le . A l l flu id except the 200* o f water cushion on top was f a i r l y heavy d r i l l i n g mud. Cement job on 7* C.P. did not hold. H e-cemented, 7* C.P. at 1094* as follow s* Hang 4^" d r i l l pipe (w ith swab assembly on bottom) with bottom o f swab assembly at 1 0 3 5 . Pumped in through d r i l l pipe, 75 sacks o f R iverside Portland cement, none treated. Cement mixed in tank by r i g ’ s crew and pumped down by r i g ’ s pumps. A fte r cementing did not c irc u la te out excess cement but p u lled d ire c tly out o f hole. Finished dementing at 11:45 P .M ., June 1st. At 8 :3 0 A .M ., June 3rd, ran in with 6-1/8" Hughes b it and found top o f cement at 840. D r ille d out cement to 1099* V below top o f bottom p e rfo ra tio n s. Cement took weight o f d r i l l pipe at 1099. Ran H a llib u rto n te ste r with 18.97 perforated t a i l piece, (in c lu d in g bomb) below, ran te ste r on bottom o f 4s* d r i l l pipe to make te st o f 7* C.P. at 1094- Set packer o f te ste r at 1038. P r io r to opening valve, the f lu i d outside the d r i l l pipe gradu ally dropped 2 f t . , due to the p erforation s above the te ste r taking flu id .'’ -Put 200’ o f water cushion In d u ll pips above te ste r, no bean in te ste r. Opened valve in te ste r at 9:14 P .M ., closed valve in te ste r at 9*39 P.M. During the 25 minutes valve was open, there was e lig h t steady blow during f i r s t 20 minutes, balance o f time blow was by heads. No drop o f f lu i d outside d r i l l pipe. P u lle d te ste r and found flu id in d r i l l pipe as follow s* Top o f f lu i d at 242* below ta b le . From top down: 200’ water cushion, 86’ d r i l l i n g mud, then 510* water (to p 80’ o f which was muddy). T otal f lu i d in d r i l l pipe a 79 6 ’ . Upon unseating packer f lu i d outside d r i l l pipe dropped 0*6". C.P. on 7* lin e r at 1094 held O.M. Finished te st at 10*00 P.M. Juno 3rd*