Skip to main content

Search the Special Collections and Archives Portal

upr000105 159

Image

File
Download upr000105-159.tif (image/tiff; 26.9 MB)

Information

Digital ID

upr000105-159
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 1 0 11 12 1 3 1 4 1 5 1 6 1 7 1 8 1 9 20 21 22 2 3 2 4 2 5 2 6 of the cost of producing, transporting and delivering water which the Railroad Companies are obligated to bear as provided in the first sentence of this Section 2. Section 3. For the purpose of determining the compensa­tion payable by the Railroad Companies to the Water Company under Section 2 of this agreement, the cost to the Water Company of pro­ducing, transporting and delivering water shall be the cost of producing water from all wells located upon the lands shown in pink on said Exhibit “A" and transporting and delivering the same into the distribution systems of the Water Company and the Rail­road Companies through the water production and transmission fa­cilities located upon said lands by means of the pipe lines col­ored in red and incidental power, telephone and telemeter lines col­ored in green on said Exhibit "A”. Such cost shall be deemed to includei (a) fhe actual cost to Water Company of labor and materials used in and directly assigned to such work. (b) A reasonable charge representing the actual cost to Water Company of all labor used in such work not directly assigned thereto in payroll distribution. (c) A reasonable charge representing the actual cost to Water Company for supervision of such direct­ly and indirectly assigned labor. (d) A reasonable charge representing the actual cost to Water Company of vacation allowances with re­spect to all labor directly or indirectly assigned and fa