Skip to main content

Search the Special Collections and Archives Portal

upr000279 186

Image

File
Download upr000279-186.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000279-186
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    L o s A n g e l e s , M arch 7 , 1 9 5 1 1 / ss; 3 MEMORANDUM: 1-7334 Mr. Roy Wchet Replying to your memorandum to me dated Maroh 2, 1951, relative to eleotrle power consumed In operating water production facilities at Las Vegas: Have developed that the amounts hilled during 1950 for energy used on well circuits Hos. 1 and 2 are substan­tially correct. Am attaching memorandum of KWH reported used for each circuit separately but part of the year was estimated. Our Mechanical Department forces rendered month­ly report on consumption to our Auditor in Omaha up to and Including the month of February, 1950, after which these reports were prepared and submitted to the Auditor by our Maintenance of Way Department. 1 am informed that during the year 1949 while Mech­anical Department furnished figures to the Auditor the amount of energy consumed in well circuits Hos. 1 and 2 was arrived at on a prorata basis and were too low as more energy was used in these 2 circuits than was reported* This acoounts for the apparent large increase in 1950 over 1949* The charge shown In monthly letter issued by the Auditor covering oost of maintaining water station facilities which included item for operating booster pump should not have been shown as this booster pump which is served from power circuit Ho. 4 is on the coach hydrant ing water pressure in watering passenger tr alinisn ea fnodr h aisn cnroeatsh­ing to do with water producing facilities. We maintain a log of well operations and attached Is statement showing number of hours by months during 1950 that electric pumps on the 3 wells Ho. 5, 6 and 7 were operated. One booster pussp at each reservoir Hos. 1 and 2 operates constantly the year around# During the hot summer months of June to September the stand-by booster pump at each of these reservoirs is also operated, depending on the weather, as much as 10 hours per day. However, no log is kept on the operation of these booster pumps*