Skip to main content

Search the Special Collections and Archives Portal

upr000270 120

Image

File
Download upr000270-120.tif (image/tiff; 27.15 MB)

Information

Digital ID

upr000270-120
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V expenses have been provided where deemed necessary. Period of Operation - The Greeley and Hansen Report assumes the B.M.I. project would take care of the water requirements of the area for a period of approximately 8 years. This study is set up for two periods, namely the first and eighth years of operation under that plan, assuming the project con­structed and operated by the Las Vegas Land and Water Company. The table attached gives the results. These show that a total operating revenue of $713,485 (Table 1) would be required for the first year of operation to net, after federal income tax at 38$, a return of 6^|$ on the total investment. Under present water rates the gross operating revenue would be deficient in the amount of ^ $499,485. During the 8th year of operation the revenue deficiency would become in excess of $570,000 to yield a 6|$ return (Table 2). The $323,000 estimate of revenue that would be realized in 1958, at present level of rates, is predicated upon the rate of growth in the consumption of water as given in Table 21 (Greeley- Hsmsen). This shows an increase of approximately 150$ (1950 - 10.6 MGD and 1958 - 16.0 MGD). Even if revenues were to increase another $50,000 or $100,000, the deficiencies under Plan No. 1 are of such staggering proportions that the plan must be deemed uneconomical and not practical for any private undertaking, as the rates to users of the service would be more than could be paid. Plan No. 2 - Water Directly from Lake Mead This plan utilizes the development to B.M.I. as the first ^ increment (heretofore designated as Plan No. 1) and which has been discussed. 2 -