Information
Digital ID
upr000214-131
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.For machinery furnished and wages of men paid by us while working on your two wells Ho. g and Ho. 10 at Las Vegas, Nevada as per detailed statement belowt 10/7 ^5 brs. Moved rig from L.A. to well site and unloaded. 10/g 11 hrs. Set up rig, cleaned out well No. g from 7^5 ft. to solid bottom at 755*• Some clay, fine sand and gravel. Swabbed well and brought in lots of fine sand and some olay. 10/9 10 hrs. Swabbed 125 G-.P.M. antdo b3a0i0l Ge.dP .wMe.ll and increased flow from 10/10 g hrs. Swabbed well;with swab in hole well flowed 600 G.P.M. but the steady flow is from }0 0 to 35© G.P.M. 10/11 12 hrs. Swabbed well. Same results as on lOtib. Tore down rig and moved equipment •to well No. 10 and started to set up, 10/12 11 hrs. Finished setting up rig, pulled 240* pump. Found hole full to 960** Cleaned out sand and clay to 10251 to 1157*• Swabbed well and increased flow to ISO G.P.M. 10/14- 10 hrs. Swabbed and surged well. Slight increase in flow. 10/15 20 hrs. Surged well, increased flow to 210 G.P.M. Well was flowing I30 G.P.M. when we started working on it. Tore down rig, loaded tools and __________ moved rig and tools to Los Angeles. log hrs.....@ 6.00 per hour'................... 64g.OO Transportation on rig and equipment to and from Job.. 4lg.00