Information
Digital ID
upr000203-093
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.LAS VEGAS, NEVADA Monday, November 13, 1950 PUMPING TEST - WELL NO. 8 — 13-3/8" O.D. Casing rr'x '0. Well Pressure - 13^ lbs. Flow prior to test ? - 877 GPM Draw Down Below Flow Concrete Top of GPM Mat Cross Started Pump 9:35 A.M. 9:45 ti 1343 29 * 32' 10:10 N 1343 29* 32' 10:40 n 1343 29« 11:10 ii 1128 17' 2302'* 11:20. it 976 11 10« 11:30 h 1182 12* 15* 11:35 ii 1343 22' 251 11:50 H 1490 33' 36' 12:20 P.M. 1490 33' 36' Water showed some sand for a while after starting pump, but cleared up O.K.