Information
Digital ID
upr000173-062
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Las fegas - September 2, w 23-1-52 Mr. C. X. Gory: Referring to ay letter August 27 regarding extension of water main to serve the school buildings In Sunrise Addition under Rule 9-As We now have Work Order authority to proceed with the installation after necessary contracts are signed. Will you please therefore prepare our usual fora of labor contract addressed to Nevada Construction Company with the description of work to be performed the same as In the contract with the School District. Tha consideration will be I860.00 and you may omit the usual provisions for bond, as the amount is less than $1,000.00. A. M, Folger